Project Manager
G
George Mihailov
This view must be the same as it was before. I have toggled Arrivals and Departures on the graph.
V
Vanja Mihalj
George Mihailov: Thank you George, I have seen this one, but I was referring at the below attached which was the previous view now changed to the one you attached. Is it possible to have the old one?
Francis Park
Vanja Mihalj: I second this. The old WIP view was very useful to monitor and reduce waste in each stage of the pipeline.